Long Lead Mini (5 metre) 12mm wide, 5 Meters long, Small Snap Hook.
Long Lead Regular (5 metre) 19mm wide, 5 Meters long, Medium Snap Hook.
For training dogs on Recall, or allowing dogs a roam in the park, or the beach, while still maintaining lead control.
Folds neatly to hang conveniently from belt loop when not in use.