Long Lead 5M

$28.20$31.70

Long Lead Mini (5 metre) 12mm wide,  5 Meters long, Small Snap Hook.

Long Lead Regular (5 metre) 19mm wide,  5 Meters long, Medium Snap Hook.

 

Is this the right lead for you, watch our video

Delivery period: 3 day(s)

Clear